How do I check the status of my building permit application?
In ePlans, open Project info for the overall status. The workflow project status report shows each review group (such as Building, Mechanical, Zoning and Fire), whether it has approved, the reviewer's contact details and their comments; the workflow routing slip shows what stage the file is at. The permit is not issued until every assigned reviewer has approved. If you applied on paper in person, check the City's building applications status tool instead.
The City asks applicants not to contact reviewers until they have finished their review.
Source: City of Mississauga, Building permit application status
How do building inspections work in Mississauga?
Inspections are mandatory for all permitted construction. Post your permit card where it can be seen, book an initial site inspection before you start to learn which inspections you need and in what order, and book each one before the work is covered with insulation, drywall, gravel or concrete. Book online with the application number and WEB ID on your building permit notice. Inspections take place Monday to Friday, 8:30 a.m. to 4:30 p.m., and the inspector tells you at the end whether the work passed.
Keep printed copies of the permit documents and approved drawings on site, in colour on paper at least 11 by 17 inches. Fire inspections are booked separately: email fire.prevention@mississauga.ca or call 905-896-5908.
Source: City of Mississauga, Book a building permit inspection
When can I move into a new house?
Before a new home can be occupied it must pass the occupancy inspection by building, plumbing and HVAC inspectors. Once it has passed all inspections, request an occupancy permit through the City's building permit inquiry service with your name, address and application number. When all required inspections have passed and the permit is closed, its online status changes to completed, all inspections signed off.
The City can only issue an occupancy permit for a new home if the building permit was applied for in 2012 or later.
Source: City of Mississauga, Book a building permit inspection
How do I change, transfer or cancel a permit?
To change the scope of work on an issued permit, ask your inspector whether you need a field revision or a formal revision application; a formal revision is a new building permit request in ePlans described as a revision to the original permit number, with a cover letter and only the changed drawings, and additional fees. To transfer an issued permit to a new owner, contact the City with a revised permit application form showing the new owner and a copy of the deed; the fee is $244. To cancel, complete the City's cancellation request form; an inspection may be needed first.
Refunds on cancellation follow the fee schedule: 85% if only administrative work has started, 65% once review has started, and 45% after the permit is issued, less 5% for each inspection done. The $50 administrative fee is not refundable.
Source: City of Mississauga, Revise, replace, transfer or cancel your building permit
How do I look up permits on a property, or report work done without one?
The City's property information tool searches any Mississauga property by address or roll number and shows its building permit application history, along with zoning, ward, heritage status and Committee of Adjustment and development application history. If you suspect work is being done without a permit, check the tool first; if no permit was issued, call 311 (905-615-4311 outside City limits) to report it.
For a report of outstanding violations, permits and inspections, the City sells a compliance report; copies of permit drawings require a Freedom of Information request.
Source: City of Mississauga, Find property information