Skip to content

Guide

Mississauga permits: decks, sheds, fences and pools

Which home projects need a City permit in Mississauga, the rules for fences, pools and trees, how applications and inspections work, and how to report a by-law problem.

Summary

Most construction, renovation and demolition in Mississauga needs a building permit, applied for online through ePlans, with a $244 minimum for residential work. Fences, small decks under 0.61 metres and small storage sheds need none, but still have to meet the zoning and fence by-laws, and pools need a separate City approval. Report a by-law problem by calling 311 (905-615-4311 outside City limits).

Last verified

Administered by the City of Mississauga: the Building Division (permits), zoning staff, Parks and Forestry (trees) and Enforcement (by-laws). Every answer below was checked against its source on November 27, 2026; the source is linked under each one.


Do I need a building permit?

What work needs a building permit in Mississauga?

The City says most renovation, construction or demolition projects do, including additions, garages, decks more than 0.61 metres (2 feet) high, covered porches, finished basements and basement apartments, below-grade entrances, new or larger windows and doors, roof changes that raise the height or change the slope, solar panels, higher-efficiency furnaces, and adding or moving plumbing fixtures. Any structure other than a shed over 10 square metres, or with plumbing, needs one.

Source: City of Mississauga, When a building permit is required

What work does not need a building permit?

The City's list includes fences, landscaping, concrete pads, painting, cabinets, re-shingling, re-cladding with the same material, same-size window and door replacements, replacing a plumbing fixture in the same place, sump pumps, retaining walls under one metre, driveway widening or resurfacing, a deck under 600 millimetres (2 feet) high, a gazebo of 10 square metres or less and a one-storey storage shed under 15 square metres with no plumbing.

You still have to meet the zoning regulations, even when a project does not need a permit.

Source: City of Mississauga, When a building permit is required

Do I need a permit for a shed?

Not for a free-standing, one-storey storage shed under 15 square metres with no plumbing. But zoning limits each shed to 10 square metres on a lot under 750 square metres (20 square metres on a larger lot), and to 3.0 metres high (3.5 metres on a larger lot), and keeps it out of the area in front of the house. In the back yard it must be at least 0.61 metres from side and rear lot lines on a smaller lot, 1.2 metres on a larger one.

Source: City of Mississauga, Zoning By-law 0225-2007, Part 4.1: General Provisions for Residential Zones

Can I add a basement apartment or garden suite?

If you own a detached, semi-detached or town home, the City allows up to two additional residential units, such as a basement apartment and a garden suite, or a fourplex. Each needs a building permit, zoning approval, and Building Code compliance, and fees and charges depend on the number of units. The City also publishes pre-approved garden suite plans.

Source: City of Mississauga, Building more units on your property


Fences, pools and trees

How high can a fence be in Mississauga?

Under the Fence By-law, a fence in a back or side yard can be up to 2 metres high. In a front yard the limit is 1 metre, or 1.5 metres if the fence is open construction, meaning at least one-third of it is see-through. Fences cannot be built on City property or road allowances, and residential fences cannot use barbed wire or other hazardous material. Most fences need no permit.

Disputes over a boundary fence's location or cost are settled between neighbours; the City does not get involved but publishes a division fence procedure. A fence exemption application costs $361.20 including HST.

Source: City of Mississauga, Fences

What do I need to install a pool or hot tub?

City approval before work starts. Submit a scaled site plan with lot grading, a legal survey, a signed statutory declaration and a pool enclosure inspection request with the $402.53 inspection fee, then pay a refundable municipal services deposit and inspection fees, attend a pre-construction meeting on site, and pass a final enclosure inspection before you fill the pool. The pool must meet the Swimming Pool Enclosure By-law and zoning setbacks.

Source: City of Mississauga, Swimming pool installation

Do I need a permit to cut down a tree on my property?

Yes, for any tree 15 centimetres (6 inches) or more in diameter, including dead or dying trees, under the Private Tree Protection By-law; work on a City tree always needs a permit. The base fee is $399.77 including HST, with $139.72 for each additional healthy tree, and no fee for dead or dying trees. The City has 30 business days to review a complete application.

Source: City of Mississauga, Tree permits

How close to the lot line can a deck be?

A deck or porch at or below the first storey may extend up to 5.0 metres into the required rear yard, but must stay at least 1.5 metres from the rear lot line and, in most cases, 0.61 metres from a side lot line. It may extend up to 1.6 metres into a required front or exterior side yard. A deck more than 0.61 metres high also needs a building permit.

Source: City of Mississauga, Zoning By-law 0225-2007, Part 4.1: General Provisions for Residential Zones


Applying, fees and inspections

How do I apply for a building permit?

Online through the City's ePlans portal: create an account, submit a building permit request and pay the administration fee, upload drawings when the City emails you, pass a pre-screen, pay the remaining fees, and wait for each review group to approve. Before you start, check your zoning, budget for costs and timelines, gather the drawings for your project type and complete the Applicable Law Form for any other approvals you need.

Source: City of Mississauga, Building permit application process

How much does a building permit cost, and how long does it take?

A residential permit costs at least $244 and a non-residential one at least $386, plus a $50 administrative fee at submission that is credited toward the total. After a pre-screen of about 7 to 10 business days, the first review of a complete application takes 10 business days for residential work, 15 for a second unit and 20 for non-residential work. On average, the City issues a residential alteration permit in 7 weeks and a new house permit in 13 weeks.

Source: City of Mississauga, Building permit cost and time frames

How do I book a building inspection?

Online, with the application number and WEB ID on your building permit notice. Book an initial site inspection before starting work, then book each stage before covering it up. Inspections run Monday to Friday, 8:30 a.m. to 4:30 p.m. Fire inspections are booked separately at fire.prevention@mississauga.ca or 905-896-5908.

Source: City of Mississauga, Book a building permit inspection

How can I see the permits and zoning for an address?

The City's property information tool searches any Mississauga property by address or roll number and shows its zoning, ward and councillor, heritage status, and its history of building permits, zoning certificates, development applications and Committee of Adjustment applications.

Source: City of Mississauga, Find property information


Property by-laws and complaints

How do I report a by-law problem in Mississauga?

Call 311 (905-615-4311 outside City limits), or visit the Customer Service Counter on the ground floor of City Hall at 300 City Centre Drive, Monday to Friday from 8:30 a.m. to 4 p.m. The City also takes some reports online, including excessive noise, graffiti, nuisance lighting and a driveway that is too wide. To report work being done without a building permit, check the property information tool first and call 311 if no permit was issued.

Source: City of Mississauga, Property standards

What do Mississauga's property standards by-laws require?

Among the common rules the City lists: grass on private property and the adjoining boulevard kept to 20 centimetres or less; buildings, railings and balconies kept structurally sound and in good repair; house numbers visible from the road; waste containers stored in the back yard, side yard or garage between pickups; exterior lights that do not shine into other properties; and pools kept enclosed and maintained. Landlords must keep rental units at 20 degrees Celsius or more all year.

The City calls this a summary only and points to the by-laws themselves for detail.

Source: City of Mississauga, Property standards

When is construction and yard-work noise allowed?

Under the Noise Control By-law, commercial construction noise is allowed Monday to Saturday from 7 a.m. to 7 p.m., not on statutory holidays, unless an exemption has been granted. In residential areas, the sound of powered or non-powered tools for domestic maintenance, such as lawn mowers and trimmers, is allowed from 9 a.m. to 7 p.m. every day, as are music from speakers and the sound of pets.

Source: City of Mississauga, Report excessive noise

Where can I read a Mississauga by-law?

The City publishes its by-laws online in an A to Z list, from the Building By-law, Fence By-law and Noise Control By-law to the Property Standards and Zoning By-laws. Call 311 (905-615-4311 outside City limits) to ask for a by-law in a different format, buy a copy of a by-law or council decision, or report a problem viewing one online.

Source: City of Mississauga, By-laws

Sources

Every factual claim above traces to one of these documents.

  1. City of Mississauga

    When a building permit is required

    Retrieved November 27, 2026

  2. City of Mississauga

    Building more units on your property

    Retrieved November 27, 2026

  3. City of Mississauga

    Fences

    Retrieved November 27, 2026

  4. City of Mississauga

    Swimming pool installation

    Retrieved November 27, 2026

  5. City of Mississauga

    Tree permits

    Retrieved November 27, 2026

  6. City of Mississauga

    Building permit application process

    Retrieved November 27, 2026

  7. City of Mississauga

    Building permit cost and time frames

    Retrieved November 27, 2026

  8. City of Mississauga

    Book a building permit inspection

    Retrieved November 27, 2026

  9. City of Mississauga

    Find property information

    Retrieved November 27, 2026

  10. City of Mississauga

    Property standards

    Retrieved November 27, 2026

  11. City of Mississauga

    Report excessive noise

    Retrieved November 27, 2026

  12. City of Mississauga

    By-laws

    Retrieved November 27, 2026