The Hazel McCallion Line (Hurontario LRT)

The 18-kilometre light rail line Metrolinx is building on Hurontario Street from Port Credit GO to Brampton: its route, stops and frequency, what it changes for drivers, cyclists and pedestrians, and where it stands.

Summary

The Hazel McCallion Line is an 18-kilometre light rail line with 19 stops along Hurontario Street, from Port Credit GO in Mississauga to the Brampton Gateway Terminal at Steeles Avenue. It was still under construction on November 27, 2026, and Metrolinx has not published an opening date; its July 2026 update said the line was moving closer to testing. Trains are planned every 7.5 minutes at peak times and every 10 to 12 minutes off-peak.

Last verified

Administered by Metrolinx, the provincial transit agency, owns and is building the line, with Mobilinx as its contractor; the City of Mississauga's Rapid Transit Program Office works with Metrolinx. Every answer below was checked against its source on November 27, 2026; the source is linked under each one.


The route

What is the Hazel McCallion Line?

The light rail transit line Metrolinx is building on the Hurontario corridor, first called the Hurontario LRT and renamed to commemorate former Mississauga mayor Hazel McCallion. It will run 18 kilometres with 19 stops, in its own dedicated lane, using electric light rail vehicles, and pass through two urban growth centres.

Source: Metrolinx, Hazel McCallion Line

Where will the Hazel McCallion Line run in Mississauga?

Along Hurontario Street, from Port Credit GO Station in the south through Cooksville and the City Centre, north to the Brampton boundary at Highway 407, and on to the Brampton Gateway Terminal at Steeles Avenue. The City says it will link to Port Credit and Cooksville GO stations, the Mississauga Transitway, the Square One GO Bus Terminal and key MiWay and Brampton Transit routes.

Metrolinx says the Port Credit GO stop is the only one below grade, under the rail line; every other stop is at street level.

Source: City of Mississauga, Hurontario Light Rail Transit

How is construction divided along Hurontario Street?

Metrolinx splits the Mississauga section into work zones: in the south, Park Street to Harborn Road past the QEW; in Cooksville, the North Service Road to Matthews Gate; in the City Centre, Matthews Gate to Eglinton Avenue; and in the north, Eglinton Avenue to Highway 407 at the Brampton boundary. Each area page posts its construction notices.

Source: Metrolinx, What we're building: Mississauga work zones


When it opens

When will the Hazel McCallion Line open?

No opening date has been announced. Metrolinx's February 12, 2026 project report listed the line as under construction, with track work done at most intersections and along the guideway and stop platforms and canopies going in. A Metrolinx update on July 29, 2026 said the line was moving closer to its testing phase.

The City says major construction began in spring 2020. Metrolinx's report expects 32 million riders by 2031.

Source: Metrolinx, CPG (Rapid Transit) State of the Network, FY 2025/26 Q3

How much does the Hazel McCallion Line cost?

Metrolinx's February 2026 report gives a project baseline of $6,027 million, including long-term financing and operating and maintenance costs over the contract term, with $3,433 million spent to the end of December 2025, $79 million of it in the October to December 2025 quarter.

Metrolinx notes the baseline excludes approved budget that is under active commercial discussion.

Source: Metrolinx, CPG (Rapid Transit) State of the Network, FY 2025/26 Q3


Riding it

What trains will the Hazel McCallion Line use?

Twenty-eight Alstom Citadis Spirit light rail vehicles, assembled at Alstom's facility in Brampton. Each is 50 metres long, carries up to 292 passengers and has low-floor boarding with four accessibility spaces per compartment. Metrolinx lists tactile guidance tiles, accessible intercoms, audible and visual next-stop announcements and all-door boarding among the line's accessibility features.

Source: Metrolinx, Hazel McCallion Line: frequently asked questions


Driving, cycling and walking along the line

How many traffic lanes will Hurontario Street have with the LRT?

Two lanes each way plus turning lanes. Metrolinx says that means adding a lane in each direction south of the Queensway, and widening Hurontario between Inglewood Street and the QEW, where there were only two lanes each way.

Source: Metrolinx, Hazel McCallion Line: frequently asked questions

Can I turn left across the LRT tracks?

Only at selected locations, usually major streets with traffic signals. At minor side streets, Metrolinx says traffic cannot cross the tracks to turn left or go straight through, so many driveways and side streets become right-in, right-out; U-turns are allowed at some locations to keep every address reachable. Some intersections need a dedicated turn signal even when the road looks clear.

Source: Metrolinx, Hazel McCallion Line: frequently asked questions

Sources

Every factual claim above traces to one of these documents.

  1. Metrolinx

    Hazel McCallion Line

    Retrieved November 27, 2026

  2. City of Mississauga

    Hurontario Light Rail Transit

    Retrieved November 27, 2026

  3. Metrolinx

    What we're building: Mississauga work zones

    Retrieved November 27, 2026

  4. Metrolinx

    Hazel McCallion Line Downtown Mississauga Extension

    Retrieved November 27, 2026

  5. Metrolinx

    CPG (Rapid Transit) State of the Network, FY 2025/26 Q3

    Published February 12, 2026 · Retrieved November 27, 2026

  6. Metrolinx

    Hazel McCallion Line: frequently asked questions

    Retrieved November 27, 2026

  7. Metrolinx

    Hazel McCallion Line safety tips

    Published July 29, 2026 · Retrieved November 27, 2026