2070 Hadwen Road
site plan
“Partial demolition of existing 1-storey, 4-storey addition to lab and manufacturing building not subject to Bill 109”
Where it stands
Stage from the City of Mississauga’s status, November 28, 2026The application has been approved. Building may not have started.
How we know
Last checked November 28, 2026City of MississaugaHow we know
- Publisher
- City of Mississauga
- Source dataset
- Rezoning and Site Plan Applications (City of Mississauga open data)
- Retrieved
- November 28, 2026
- Licence
- City of Mississauga Terms of Use Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by MississaugaIQ
- the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- MississaugaIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “Partial demolition of existing 1-storey, 4-storey addition to lab and manufacturing building not subject to Bill 109”. Latest dated step on the record: approval, January 6, 2025. File SP 24/2. As of November 28, 2026 · City of Mississauga
Data currency. Read from the City of Mississauga source on November 28, 2026. The source was last edited November 1, 2026. Newest date on any record: October 28, 2026. Rezoning and Site Plan Applications (City of Mississauga open data)
What is being asked
2070 Hadwen Road is the site of 2 applications on the City of Mississauga's record (site plan) proposing 10,758 m² of floor space in Ward 2. It has been approved.
What is proposed
Partial demolition of existing 1-storey, 4-storey addition to lab and manufacturing building not subject to Bill 109
The City of Mississauga’s description of the applications, as published.
The 2 applications
The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.
Site plan
SP 24/2
- Type
- Site plan (SITE PLAN)
- Status on the record
- Approved
- Received
- January 12, 2024
- Approval
- January 6, 2025
- Category (City's words)
- Site Plan Applications including SPAX - Industrial
- Location (City's words)
- The property is located on Hadwen Road between Speakman Drive and N Sheridan Way
- Non-residential gross floor area, m² (City's figure)
- 10758
Site plan
SP 24/2
- Type
- Site plan (SITE PLAN)
- Status on the record
- Approved
- Received
- January 12, 2024
- Approval
- January 6, 2025
- Category (City's words)
- Site Plan Applications including SPAX - Industrial
- Location (City's words)
- The property is located on Hadwen Road between Speakman Drive and N Sheridan Way
- Non-residential gross floor area, m² (City's figure)
- 10758
Filings since 2024
Approval
Site plan · SP 24/2 · 2025
Application received
Site plan · SP 24/2 · 2024
The record shows nothing dated after January 6, 2025; the next recorded step appears here when the municipality enters it.
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 2- This project
- Under review (5)
- Approved (8)
- 1 km
- 2270 Speakman DriveStage: ApprovedZoning by-law amendment · Ward 2 · 120 m
- 2251 North Sheridan WayStage: Under reviewSite plan · Ward 2 · 140 m
- 2145 North Sheridan WayStage: ApprovedSite plan · Ward 2 · 350 m
- 2395 Speakman DriveStage: Under reviewSite plan · Ward 2 · 500 m
- 2180 Speakman DriveStage: ApprovedSite plan · Ward 2 · 500 m
Statuses as the City of Mississauga publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Parks nearby
- Kogaydiwin ParkCommunity Park · ball diamond, playground · 500 m
- Sheridan ParkCommunity Park · outdoor fitness equipment, playground · 520 m
- Sheridan Creek TrailGreenlands Park · 520 m
- Kogaydiwin TrailGreenlands Park · 620 m
Community facilities nearby
- Sheridan Librarylibrary branch · 1.1 km
- Clarkson Community Centrecommunity centre, arena, indoor pool · 1.1 km
- David Ramsey Outdoor Pooloutdoor pool · 1.4 km
Schools, heritage and transit
Nearest schools
- Iona Secondary School · secondary school · 670 m
- École élémentaire Horizon Jeunesse · elementary school · 980 m
- Homelands Senior Public School · elementary school · 990 m
Transit routes nearby(a published route path within 500 m, as the crow flies)
- Route 45 Winston Churchill · regular route · path 110 m away
- Route 71 Sheridan · regular route · path 110 m away
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.2070 Hadwen Road is here.
- Stage: Complete
- Final approval has been given or the plan has been registered.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.
- Stage: Refused
- The application was refused.
Sources
- 01Rezoning and Site Plan Applications (City of Mississauga open data) — checked November 28, 2026
Contains information made available under the City of Mississauga's Terms of Use City of Mississauga Terms of Use. Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.