Development application SP 18/021 · Ward 5

2095 & 2105 Matheson Blvd E.

site plan

Stage: ApprovedOn the record: “Approved”Filed March 1, 2018
“two single-storey office buildings”
The City of Mississauga’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Mississauga’s status, November 28, 2026

The application has been approved. Building may not have started.

Diagram of the zoning around 2095 & 2105 Matheson Blvd E.The municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded E1. A diagram, not to scale and not a survey: no building or design is drawn.E1Diagram, not to scaleCity of Mississauga zoning and planning open data
Zoning areas around the site; the recorded point falls in E1 today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File SP 18/021.
10,606m²
non-residential floor area
City of Mississauga record
1
application in this project: site plan
City of Mississauga record
2
dated steps on the record; the latest May 24, 2019
Checked November 28, 2026
How we know
Last checked November 28, 2026City of MississaugaHow we know
Publisher
City of Mississauga
Source dataset
Rezoning and Site Plan Applications (City of Mississauga open data)
Retrieved
November 28, 2026
Licence
City of Mississauga Terms of Use Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by MississaugaIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
MississaugaIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “two single-storey office buildings”. Latest dated step on the record: approval, May 24, 2019. File SP 18/021. As of November 28, 2026 · City of Mississauga

Data currency. Read from the City of Mississauga source on November 28, 2026. The source was last edited November 1, 2026. Newest date on any record: October 28, 2026. Rezoning and Site Plan Applications (City of Mississauga open data)

What is being asked

One application

2095 & 2105 Matheson Blvd E. is a site plan on the City of Mississauga's record proposing 10,606 m² of floor space in Ward 5. It has been approved.

What is proposed

two single-storey office buildings

The City of Mississauga’s description of the application, as published.

The application

As the municipality records it.

  1. Site plan

    SP 18/021

    Type
    Site plan (SITE PLAN)
    Status on the record
    Approved
    Received
    March 1, 2018
    Approval
    May 24, 2019
    Category (City's words)
    Site Plan Applications including SPAX - Office
    Location (City's words)
    Southwest corner of Matheson Blvd. and Spectrum Way.
    Non-residential gross floor area, m² (City's figure)
    10605.79

Filings since 2018

Every dated item on the record
Dated steps on the record for 2095 & 2105 Matheson Blvd E.2018-03-01: Application received (Site plan); 2019-05-24: Approval (Site plan).2018-03-01: Application received2019-05-24: Approval
  1. Approval

    Site plan · SP 18/021 · 2019

  2. Application received

    Site plan · SP 18/021 · 2018

The record shows nothing dated after May 24, 2019; the next recorded step appears here when the municipality enters it.

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 5
2095 & 2105 Matheson Blvd E. and other planning files within 1 km2095 & 2105 Matheson Blvd E. (ringed) and 3 other significant files on the City of Mississauga's record within 1 km, over the zoning layer.2200 Skymark Avenue · Under review · 600 m5100 Satellite Drive · Approved · 650 m5050 Satellite Drive · Approved · 670 m1 km around the siteCity of Mississauga open data
  • This project
  • Under review (1)
  • Approved (2)
  • 1 km

Statuses as the City of Mississauga publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

2095 & 2105 Matheson Blvd E.
Aerial view of 2095 & 2105 Matheson Blvd E., Mississauga
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Schools, heritage and transit

Nearest schools

Transit routes nearby(a published route path within 500 m, as the crow flies)

1 more within that distance; all of them.

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every MississaugaIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.2095 & 2105 Matheson Blvd E. is here.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Rezoning and Site Plan Applications (City of Mississauga open data) — checked November 28, 2026

Contains information made available under the City of Mississauga's Terms of Use City of Mississauga Terms of Use. Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.