CAPREIT applies to add 112 rental townhouses at 1055 Bloor Street and 40 at 2121 Rathburn Road East, beside existing Ward 3 apartment towers
Two rezoning applications posted November 25 would add three-storey stacked back-to-back townhouses at a 17-storey tower in Applewood and a 13-storey tower in Rathwood. The existing rental apartments stay; no public meeting date is listed yet.
The update
- 1055 Bloor Street (OZ 26-17 W3): four blocks of stacked back-to-back townhomes with 112 units beside the existing apartment building at Bloor Street and Riverspray Crescent.
- 2121 Rathburn Road East (OZ 26-16 W3): one block with 40 units along Rathburn Road East beside the existing apartment building by Etobicoke Creek.
- Both applications are at the received stage with no public meeting date listed; comments go to City Planner Michal Stolarczyk.
Why it matters. Tenants of the two towers and neighbours in Applewood and Rathwood can comment now, before a public meeting is scheduled, on townhouse infill on the grounds of both towers.
What is proposed
The City of Mississauga posted two new development applications in Ward 3 on November 25, 2026, both from CAPREIT Apartments Inc. At 1055 Bloor Street (file OZ 26-17 W3), the application includes four blocks of stacked back-to-back townhomes with 112 units. At 2121 Rathburn Road East (file OZ 26-16 W3), it includes one block with 40 units. On both sites, the City says, the existing rental apartment will be retained.
Both are listed at the received stage. Neither City page gives a public meeting date as of November 28. Residents who want to comment or ask questions can email City Planner Michal Stolarczyk, who is listed as the contact for both files; the Ward 3 councillor is Chris Fonseca.
- 1055 Bloor Street
- OZ 26-17 W3; 112 townhouse units in four blocks; existing 17-storey building with 323 units stays
- 2121 Rathburn Road East
- OZ 26-16 W3; 40 townhouse units in one block; existing 13-storey building with 139 units stays
- Height
- Three storeys, with a raised basement level
- Tenure
- Rental, according to the applicant
- Stage
- Received; no public meeting date listed
- Contact
- City Planner Michal Stolarczyk
1055 Bloor Street, Applewood
According to the applicant's cover letter, dated October 2, the 2.8-hectare site sits at the northeast corner of Bloor Street and Riverspray Crescent in the Applewood Neighbourhood and is now a tower-in-the-park layout: a 17-storey apartment building with 323 units surrounded by open areas, a surface parking lot and outdoor amenity space. Two townhouse blocks would face Bloor Street and two Riverspray Crescent.
The letter gives a mix of 56 three-bedroom units, 40 three-bedroom-plus-den units and 16 four-bedroom units, intended as rental housing alongside the existing rental units. It says a total of 445 vehicle parking spaces would be retained and 75 bicycle parking spaces added within the existing below-grade and surface parking, with no change to the surface parking along the east edge of the site.
2121 Rathburn Road East, Rathwood
The cover letter for this file, dated September 29, describes a 1.7-hectare site on the west side of Rathburn Road East, abutting Etobicoke Creek to the north and west, in the Rathwood Neighbourhood, with a 13-storey apartment building containing 139 units. The single townhouse block would run along Rathburn Road East.
The proposed mix is 20 three-bedroom, 16 three-bedroom-plus-den and 4 four-bedroom units. The letter says 238 parking spaces would serve the existing building and the townhouses, including 21 new surface spaces west of the block, against a zoning minimum of 237, plus 30 bicycle spaces. The City's application summary says the file was received on November 16, 2026 and deemed complete on November 25.
Why a rezoning now
Both letters say the projects have been in the City's site plan process since 2025 and were expected to go ahead through site plan approval and minor variances. Based on more recent feedback through the Committee of Adjustment process, the applicant says, it is now seeking a zoning by-law amendment for each site to achieve zoning certainty. The applications have not been approved.
Spotted an error? We keep the URL, update the timestamp and record the change. Our corrections policy.